Translate Blog

Tuesday, 24 October 2017

N/S Doors

Finally received a call from Ribble Technology to say my doors were ready for collection. I seemed to have been waiting for months but they have done a excellent job. They have been stripped of all paint, sealer, filler etc down to bare metal then de-rusted and phosphate coated then finally a electrostatic epoxy primer. The door bottoms have had previous (bad) repairs carried out but are in better condition than I expected. The top of the doors need the usual stress fractures sorting out by brazing, the metal is very thin here and I think I need to weld in a plate in the N/S/R inner.

I will post updates when the cutting and welding begins.







No comments:

Post a Comment