Translate Blog

Thursday, 21 March 2013

N/S/F Jacking point

The old jacking point on the n/s/f removed by drilling out the spot welds and cutting out the old metal, everything straightened out and cleaned up ready for welding in the new one.

N/S/F jacking point removed, you can now see the run of the hydraulic pipes.
New jacking point welded in place primed, sealed and painted.

Tuesday, 19 March 2013

Hydraulic pipes

The hydraulic pipes on the n/s are in good condition, these have been replaced at some time and have been well treated with wax.

N/S/F hydraulic pipework

N/S sill repairs

The DS has been turned around to start work on the sill and floor on the n/s At first glance this side seems to be a little less worse than the o/s

 
Reapir panel cut to size and clamped in place ready for welding.